MET-03kWh under-report vs utility CT
Cross-brand / Protocol · DC Fast Chargers
Verified 2026-08-013 field confirmsSeverity: medium ~60 min
Safety
Live connectors and HV may be present during handshake faults — follow pad LOTO when opening equipment.
Full procedure requires solo+
Symptom teaser: kWh under-report vs utility CT (MET-03) — Metering field fault. Stay OEM-agnostic until the protocol stage pins a hardware path; capture SECC/OCPP/vehicle evide…