The EVSE DirectorySubscribe

Fault database

Search by code, symptom, brand, category, or connector. Full procedures gated by subscription — look for green Free sample badges for open procedures.

Viewing as free

16 results

LOAD-01Cross-brand / Protocol · Power cabinet / LMSFree sample

Dynamic load management caps to 0 A

Dynamic load management caps to 0 A (LOAD-01) — Load management field fault. Stay OEM-agnostic until the protocol stage pins a hardware path; capture SECC/OCPP/vehicle evidence before opening the cabinet.

2 confirmed
CFG-03Cross-brand / Protocol · DC Fast ChargersFree sample

Power module map incorrect after expansion

Power module map incorrect after expansion (CFG-03) — Configuration field fault. Stay OEM-agnostic until the protocol stage pins a hardware path; capture SECC/OCPP/vehicle evidence before opening the cabinet.

2 confirmed
CP-E250-PFCChargePoint · Express 250 · DC Fast ChargersEarly access pro+

PFC stage overcurrent

ChargePoint PFC stage overcurrent (CP-E250-PFC) — confirm Express power cabinet vs dispenser ownership before parts. Fie…

1 confirmed
ABB-T54-GRIDABB · Terra 54 · DC Fast Chargers solo+

Grid undervoltage trip

Terra 54 grid undervoltage trip — utility/feeder sag coinciding with charge start. Field techs should correlate HMI/Clou…

2 confirmed
TRI-PK-PWRTritium · PK350 · DC Fast ChargersEarly access pro+

Rectifier stage fault

PK rectifier stage fault — early-access HV power stage; LOTO and OEM diagnostics. Field techs should correlate HMI/Cloud…

3 confirmed
BTC-HP-PFCBTC Power · HP150 · DC Fast Chargers solo+

Input PFC fault

BTC HP input PFC fault — grid/PFC stage under load; correlate site voltage. Field techs should correlate HMI/Cloud times…

2 confirmed
KEM-SAT-DYNKempower · Satellite · DC Fast ChargersEarly access pro+

Dynamic power allocation stuck

Kempower dynamic power pool fault — early-access pool assignment/module map issues. Field techs should correlate HMI/Clo…

2 confirmed
CAB-BUSSite stack (generic) · LMS / power cabinet · Power cabinet / LMS solo+

DC bus undervoltage

DC bus undervoltage — bus collapses under load from grid/feed or module issues. site-generic field note: keep evidence s…

2 confirmed
CAB-PARSite stack (generic) · LMS / power cabinet · Power cabinet / LMS solo+

Parallel cabinet sync fail

Parallel cabinet sync fail — paralleled cabinets refuse to share or sync DC bus. site-generic field note: keep evidence …

3 confirmed
DEP-SEQSite stack (generic) · Power cabinet / LMS solo+

Sequential start brownout

Sequential start brownout — too many stalls authorize together; voltage sag trips protection. site-generic field note: k…

2 confirmed
ALP-HYC-GRIDAlpitronic · HYC300 · DC Fast Chargers solo+

Grid overvoltage

Alpitronic Hypercharger trips on grid overvoltage, aborting active sessions and refusing new ones until the input voltag…

2 confirmed
PE-NB-GRIDPower Electronics · NB 360 · DC Fast Chargers solo+

Input phase loss

Power Electronics NB360 loses an input grid phase, faulting the cabinet in a way that can superficially resemble a modul…

2 confirmed
SCH-EV-PHASESchneider Electric · EVlink · AC Level 2 solo+

Missing phase on 3P install

Schneider EVlink on a three-phase install reports a missing or unbalanced phase after panel or breaker work: the unit ei…

1 confirmed
BESS-UVFluence / BESS · BESSFree sample

BESS undervoltage at cabinet

Fluence BESS reports an undervoltage (UV) inhibit at the EVSE feed — either the PCS AC output or the shared DC bus — so dependent chargers brown out mid-session or latch Faulted while the BESS HMI independently alarms UV. It shows up most on hot afternoons when several dispensers ramp together and SOC is already drawn down from an overnight fleet pull, so the first minutes of triage are about proving whether the EVSE is really broken or the depot just asked for more than the BESS could deliver at that SOC.

2 confirmed
BESS-OVFluence / BESS · BESS solo+

BESS overvoltage trip

Fluence BESS overvoltage (OV) protection trips and opens the discharge/charge path feeding the EVSE bus, so dependent di…

3 confirmed
SWG-PFEaton · Switchgear solo+

Power factor / harmonic trip

Power factor or harmonic distortion protection trips, or the utility flags a power quality complaint, and the timing lin…

1 confirmed