DEP-SEQSequential start brownout
Site stack (generic) · Power cabinet / LMS
Verified 2026-08-012 field confirmsSeverity: medium ~60 min
Safety
Site switchgear, contactors, and cooling loops have their own LOTO — do not skip trade boundaries.
Full procedure requires solo+
Symptom teaser: Sequential start brownout — too many stalls authorize together; voltage sag trips protection. site-generic field note: keep evidence scrubbed and prove the rank…