Arcbound Field · Field sheet · Cross-brand / Protocol · LOAD-01
LOAD-01Dynamic load management caps to 0 A
Cross-brand / Protocol · Power cabinet / LMS
Safety
Qualified EVSE personnel only. Follow site LOTO and OEM HV / arc-flash boundaries. Not a substitute for OEM service manuals or AHJ requirements.
How it presents
- Display
- Dynamic load management caps to 0 A
Symptom
Dynamic load management caps to 0 A on protocol: CSMS StatusNotification + connector LEDs shows LOAD-01. Techs see session abort or stall Unavailable until the ranked cause is cleared. Correlate OCPP websocket / SECC / vehicle logs as applicable before opening the cabinet.
Root causes (by observed frequency)
- #1 LMS / site power budget cutting protocol to zero or near-zero
- #2 LMS heartbeat loss forcing failsafe curtail
- #3 Wrong feeder CT / priority map after expansion
Diagnostic procedure
1. Capture CSMS StatusNotification + connector LEDs message for LOAD-01, connector ID, and last successful session time
Expected: Exact display string + OCPP status/errorInfo if present
Tools: phone photos (scrubbed), CSMS
2. Pull OCPP websocket / SECC / vehicle logs as applicable; confirm whether Dynamic load management caps to 0 A follows one gun, one cabinet, or the whole site
Expected: Fault correlates to one path
Tools: CSMS export, OEM cloud
3. On hardware, isolate power quality / protective devices before opening HV for LOAD-01
Expected: Voltage in band; no unexpected trips
Tools: DMM, IR gun, LOTO kit
4. Execute rank-1 cause check for “Dynamic load management caps to 0 A”; swap known-good cable/gun or stall if available
Expected: Fault moves with cable or stays with cabinet
Tools: known-good cable, IR, OEM service menu
5. If unresolved, escalate with LOAD-01 evidence pack (HMI photo, OCPP snippet, readings) — Stay OEM-agnostic until the protocol stage pins a hardware path
Tools: ticket template
The fix
Clear LOAD-01 (Dynamic load management caps to 0 A) by correcting the ranked cause on protocol, then run a full validation session.
Suspect module or controller indicated by rank-1 cause
OEM protocol service channel; keep serial for RMA
LOAD-01
- LOTO and verify zero energy per protocol HV procedure before any bus work
- Correct rank-1 cause for LOAD-01; do not shotgun-replace modules
- Clear fault latches in HMI/CSMS; confirm StatusNotification returns to Available/Preparing as appropriate
- Run validation: authorize → handshake → ≥5 minutes energy → clean stop; capture MeterValues
- Document firmware, part lots, and scrubbed HMI photos for confirmations
Related entries
Related guides
Field confirmations (2) — subscribers only, one per account.
Missing a sibling fault? Request an entry