The EVSE DirectorySubscribe

Equipment category

Power cabinet / LMS

Power cabinet / LMS (field intro)

Power cabinets and load-management systems (LMS) decide how many amps each stall may draw. Tickets here look like “charger broken” when the real story is dynamic caps, offline modules in a shared pool, or a cabinet feed that collapses under simultaneous ramp.

What you are diagnosing

LMS can legally command 0 A during peaks. Shared power units (for example Kempower pools) can starve satellites when modules are offline. Site switchgear and transformers create undervoltage that every brand reports differently. Your job is to separate curtailment, cabinet hardware, and utility feed before RMA.

How it presents

  • Sessions start then collapse as more stalls plug in
  • All connectors Available but deliver near-zero power
  • One power unit’s satellites fail together
  • Voltage sag under load with healthy idle readings

Entries: LOAD-01, KEM-SAT-LINK. Guides: site power quality, fleet CMS when schedules/mapping interact with caps.

Field discipline

  1. Ask ops whether LMS/curtailable rates were active in the window.
  2. Compare idle vs loaded voltage at the cabinet.
  3. Count online modules / available pool kW vs demanded sessions.
  4. Confirm connector ID mapping in CSMS for multi-dispenser cabinets.
  5. Hand feeder/transformer issues to the electrician with measurements attached.

Browse power-cabinet and LMS faults below. Do not condemn a dispenser because the LMS did its job at 17:00.

Shared vs dedicated power

Dedicated cabinets fail alone. Shared power units fail as a group of satellites. LMS fails as a schedule: power returns when the curtail window ends. Write which pattern you saw in the first sentence of the ticket.

What not to do

Do not override LMS without ops approval. Do not condemn dispensers because the pool was empty at peak. Do not skip loaded voltage measurements when the whole pad sags.

Faults (10)

LOAD-01Cross-brand / Protocol · Power cabinet / LMSFree sample

Dynamic load management caps to 0 A

Dynamic load management caps to 0 A (LOAD-01) — Load management field fault. Stay OEM-agnostic until the protocol stage pins a hardware path; capture SECC/OCPP/vehicle evidence before opening the cabinet.

2 confirmed
LOAD-02Cross-brand / Protocol · Power cabinet / LMSFree sample

LMS heartbeat lost — failsafe curtail

LMS heartbeat lost — failsafe curtail — chargers derate or go Unavailable when site LMS/PLC heartbeat drops, protecting the feeder. protocol field note: keep evidence scrubbed and prove the ranked cause before module RMA on LOAD-02.

2 confirmed
LOAD-03Cross-brand / Protocol · Power cabinet / LMS solo+

LMS priority starves fleet overnight

LMS priority starves fleet overnight (LOAD-03) — Load management field fault. Stay OEM-agnostic until the protocol stage…

2 confirmed
LMS-ZEROSite stack (generic) · LMS / power cabinet · Power cabinet / LMS solo+

LMS allocates 0 A all ports

LMS allocates 0 A all ports — site controller sets zero budget; stalls idle with healthy hardware. site-generic field no…

1 confirmed
LMS-COMSite stack (generic) · LMS / power cabinet · Power cabinet / LMS solo+

LMS PLC offline

LMS PLC offline — chargers lose LMS and enter failsafe curtail/Unavailable. site-generic field note: keep evidence scrub…

3 confirmed
CAB-FANSite stack (generic) · LMS / power cabinet · Power cabinet / LMS solo+

Power cabinet fan fail

Power cabinet fan fail — thermal alarms with stopped or noisy cabinet fans on the site power cabinet, often after dusty …

1 confirmed
CAB-BUSSite stack (generic) · LMS / power cabinet · Power cabinet / LMS solo+

DC bus undervoltage

DC bus undervoltage — bus collapses under load from grid/feed or module issues. site-generic field note: keep evidence s…

2 confirmed
CAB-PARSite stack (generic) · LMS / power cabinet · Power cabinet / LMS solo+

Parallel cabinet sync fail

Parallel cabinet sync fail — paralleled cabinets refuse to share or sync DC bus. site-generic field note: keep evidence …

3 confirmed
DEP-CURTSite stack (generic) · Power cabinet / LMS solo+

Depot LMS curtails on demand response

Depot LMS curtails on demand response — scheduled DR event cuts amps across the depot. site-generic field note: keep evi…

1 confirmed
DEP-SEQSite stack (generic) · Power cabinet / LMS solo+

Sequential start brownout

Sequential start brownout — too many stalls authorize together; voltage sag trips protection. site-generic field note: k…

2 confirmed