The EVSE Directory · Field sheet · Cross-brand / Protocol · NET-C06
NET-C06Free sampleCSMS rate-limits StatusNotification
Cross-brand / Protocol · DC Fast Chargers
Safety
Avoid unnecessary full-pad power cycles.
How it presents
Symptom
CSMS rate-limits StatusNotification — after a reconnect storm the CSMS throttles, chargers appear offline/Faulted in UI despite healthy hardware. protocol field note: keep evidence scrubbed and prove the ranked cause before module RMA on NET-C06.
Root causes (by observed frequency)
- #1 Mass reconnect storm after site power blip
CSMS protecting itself
- #2 Charger retry loop too aggressive
- #3 CSMS misconfigured rate limit too low for pad size
- #4 Monitoring tool amplifying status storms
Diagnostic procedure
1. Check CSMS rate-limit / HTTP 429 / throttle logs
Expected: Throttle evidence
Tools: CSMS admin
2. Correlate with site power or modem reconnect event
Expected: Storm start
Tools: timeline
3. Backoff charger reconnects per OEM if configurable
Expected: Slower retries
Tools: HMI
4. Ask CSMS to raise limits or stagger pad reconnects
Expected: Accepts statuses
Tools: CSMS
5. Confirm StatusNotifications flow after quiet period
Tools: CSMS
The fix
Rate-limit Soft-offlines are CSMS/ops storms — stagger reconnects, don’t RMA modules.
- Wait out or stagger reconnects instead of power-cycling every stall.
- Tune charger retry backoff if OEM provides it. Document readings and scrubbed photos for NET-C06 before closing the ticket.
- Resize CSMS rate limits for the pad’s stall count. Document readings and scrubbed photos for NET-C06 before closing the ticket.
- Stop third-party pollers that amplify storms. Document readings and scrubbed photos for NET-C06 before closing the ticket.
- Validate steady StatusNotification flow before closing the ticket.
Related entries
Related guides
Field confirmations (1) — subscribers only, one per account.
Missing a sibling fault? Request an entry